Quick Answer

Basement Finishing Cost in Edmonton (2026)

Average cost in Edmonton

$45,000/ sq ft

$20,000 — $90,000

$30 — $80 per sq ft

+4.5% YoY
6 sources
Updated today
Alberta

Cost Breakdown

Itemized
Labor

Framing, drywall installation, and finishing

$9,000 — $40,000

45%

Materials

Lumber, drywall, flooring, and paint

$7,000 — $30,000

35%

Plumbing & Electrical

Wiring, lighting, and bathroom rough-ins

$3,000 — $15,000

15%

Permits & Inspections

City of Edmonton building permits

$800 — $2,000

5%

🧾GST (5%) — Alberta
Base cost + $2,250 tax$47,250

GST at 5%

🧮Estimate Your Cost

Interactive

Estimated Cost

$0

$0 — $0

Based on 6 sources and market data for Edmonton. Actual costs may vary depending on specific project requirements.

🏢Top Basement Finish Contractors in Edmonton

Via Google
🔨

Above Grade Construction Services

16647 113 Ave NW, Edmonton, AB T5M 2X2, Canada

5.0
★★★★★

86 reviews

🔨

Do It All Contracting Ltd

16 Holly Pl, St. Albert, AB T8N 6W7, Canada

5.0
★★★★★

67 reviews

🔨

Priority Builders Renovations

10623 170 St NW, Edmonton, AB T5P 4W2, Canada

5.0
★★★★★

41 reviews

🔨

Knights Ridge Builders and Renovations

14943 72a St NW, Edmonton, AB T5C 0S3, Canada

4.9
★★★★½

113 reviews

🔨

Mode Built Basements

18304 105 Ave NW #207, Edmonton, AB T5S 2L5, Canada

4.9
★★★★½

74 reviews

Provider data sourced from the Google Places API. Ratings and reviews are public and may change. LookupCost is not affiliated with listed providers.

💬What People Actually Paid

Community

Common Questions

Yes, the City of Edmonton requires permits for structural changes, electrical or plumbing modifications, and legal secondary suites. You should budget between $800 and $1,500 for permit fees.

Adding a bathroom to your basement renovation typically increases the total cost by $8,000 to $15,000, depending on existing plumbing rough-ins and the quality of the fixtures.

Yes, a standard finished basement can add $30,000 to $50,000 to your home's resale value. Developing a legal secondary suite can add $60,000 to $90,000, offering an average ROI of 70% to 85%.

Most basement finishing projects in Edmonton take between 4 to 10 weeks to complete. Timelines vary based on the scope of work, such as adding a kitchen or bathroom, and contractor availability.

📊Data Sources

Methodology
1

AI-synthesized from 6 web sources (gemini-3.1-pro-preview)

2

Licensed contractor estimates and cost guides

3

Government construction statistics (BLS/StatCan)

Last data collection: 2026-04-13T20:22:34.972624+00:00. Next scheduled update: . All costs in CAD.