Bathroom Renovation Cost in Victoria (2026)
Average cost in Victoria
$8,500 — $75,000
$185 — $475 per sq ft
Cost Breakdown
ItemizedPlumbing, electrical, and tiling specialists
50%
Vanity, toilet, tub, and hardware
35%
Schluter systems and cement board
10%
City of Victoria fees and bin rentals
5%
GST+PST at 12%
📋What's Included
ScopeTypically Includes
- Vanity & sink replacement
- Toilet replacement
- Tub/shower update
- Tile flooring & walls
- Basic plumbing
- Lighting & exhaust fan
- Labor & installation
Typically Excludes
- Full tub-to-shower conversion
- Heated floors
- Custom glass enclosures
- Structural modifications
- Permits
Based on a standard 5x8 ft bathroom. Master bath or custom designs may cost more.
🧮Estimate Your Cost
InteractiveEstimated Cost
$18,200 — $27,300
Based on 9 sources and market data for Victoria. Actual costs may vary depending on specific project requirements.
📈Price Momentum
Year-over-year~1 year ago
$29,330
Today
$30,855
Bathroom Renovation in Victoria is ↑ 5.2% compared to roughly a year ago — about $1,525 more on the average project.
Comparison derived from the year-over-year change rate, not a month-by-month price index. We don't store historical snapshots yet — when we do, this will become a real time series.
🏢Top Bathroom Reno Contractors in Victoria
Verified providersSouthern Comfort Renovations
2014 Fernwood Rd, Victoria, BC V8T 2Y9, Canada
26 reviews
Green Island Builders Ltd
3030 McAnally Rd, Victoria, BC V8N 1T4, Canada
40 reviews
CVR construction LTD.
1226 Finlayson St, Victoria, BC V8T 2V3, Canada
35 reviews
Provider data sourced from public business directories. Ratings and reviews are public and may change. LookupCost is not affiliated with listed providers.
💬What People Actually Paid
Community❓Common Questions
Yes, a permit is required if you are moving plumbing fixtures, altering electrical circuits, or changing structural walls. In Victoria, permit fees typically range from $500 to $2,000 depending on the total construction value.
For Victoria homes built before 1990, major structural renovations may trigger mandatory seismic upgrades. These upgrades can add between $20,000 and $50,000 to a project if structural walls are opened.
Homeowners in Victoria can expect a Return on Investment (ROI) of approximately 65% to 80% for mid-range bathroom renovations, which is higher than the national average due to the city's competitive real estate market.
A standard full renovation typically takes 5 to 8 weeks. This timeline includes 1-2 weeks for demolition and rough-ins, 2-3 weeks for tiling and waterproofing, and 1-2 weeks for final fixture installation and inspections.
📊Our Methodology
How we collect dataAggregated from 5+ verified web sources and cost databases
Licensed contractor estimates and regional cost guides
Government construction and labor statistics
Community-reported project costs and reviews
Last data collection: 2 weeks ago. Updates run weekly. All costs in CAD.
About this data
Cost figures are estimates synthesized from public market data using AI research and refreshed regularly. Real project costs vary by scope, materials, contractor, and site conditions. Always get verified quotes from licensed contractors for your specific project.
Spotted bad data? Let us know — we'll review and update.